Open →Switching payment administration is a project, not a phone call. This is the sequence that avoids the three usual failure modes.
Switching payment administration is a 30-day project, not a phone call. This is the sequence that avoids the three failure modes we see most often: a half-finished integration, a team that was never trained on the script, and 400 live plans migrated in one weekend.
Get all of this in writing. A provider that will not put it in writing is telling you something.

| # | Confirm in writing | Why it matters |
|---|---|---|
| 1 | Complete fee schedule: transaction fee by method, card discount rate, returned-item handling | Rates are quoted per practice, not published — everything is negotiable and nothing is comparable without the document |
| 2 | That there are no setup fees and no monthly minimums | This is the stated structure; confirm it applies to your quote |
| 3 | Which services you are buying, à la carte | You should not be paying for analytics in year one if drafting is not yet fixed |
| 4 | Your exact practice management software and version is supported, and whether posting is automatic or file-based | This single answer determines whether you get the staffing benefit at all |
| 5 | The deposit schedule | Model cash flow against deposits, not individual draft dates |
| 6 | Failed-draft handling: how quickly contact is made, how the follow-up draft is scheduled | This is the product you are actually buying |
| 7 | Collection tiers and their cost | Three tiers via a third-party agency at discounted rates for clients — know the prices before you need them |
| 8 | What training is included, and whether it repeats for new hires | Turnover will erase an un-repeatable training in eighteen months |
| 9 | Volume discount thresholds | Pre-purchase volume discounts exist; know your annual payment count before the call |
| 10 | Exit terms and what happens to in-flight plans | The question practices forget. Ask it first. |
Not “we integrate with your system” — test that an account created in your practice management software establishes the plan, and that a processed payment posts back automatically. Due-diligence checklist →
Minimum payment amount, and a maximum — the maximum exists specifically to reduce responsible-party input errors on self-service payments. Set the max high enough that a family can pay off early in one transaction.
Run one cycle and reconcile the deposit statement against your ledger before you scale. Fix discrepancies now, not at 200 plans.
The practice is notified when a draft fails. Decide who reads those and what they do — usually nothing, which is the point, but somebody should be watching the pattern.
This is the phase practices skip, and it is the one that determines results. Training is included — including presentation skills training — so use it rather than briefing the team yourself over a lunch.
Review these six monthly against your baseline:
If delinquency has not moved after two quarters, the problem is almost certainly plan sizing at signature rather than collections — which is a presentation fix, not a vendor fix. Where receivables actually leak →
Do not switch services on in parallel. Payment management, then integration, then risk recommendations, then fee presentation, then analytics. Running four changes at once means you will never know which one moved the number.
Our desk tracks how orthodontic payment management actually works in practice: ACH and card drafting mechanics, failed-draft recovery, soft credit recommendations, treatment fee presentation and accounts-receivable reporting. Every page is checked against the provider's own published documentation and public industry reporting before it goes live, and we flag clearly when a number is a practice-set variable rather than a published rate. Read how we research and review.
Plan for 30 days to go live properly, then two quarters of measurement. The sequence that works is foundations and baseline metrics, technical setup and integration testing, team training on the presentation script, then migration starting with new case starts.
No. Start with new case starts for two weeks, then migrate existing plans in batches grouped by draft date, and hold problem accounts until last. Write to families before you migrate them, not after.
Two things: the complete fee schedule in writing, since rates are quoted per practice rather than published; and whether payment posting into your exact practice management software and version is automatic or a file import.